Thermoplastics have taken the clean industries by storm, hailed for their chemical resistance, cost-effectiveness, and cleanroom compatibility. But despite all the advantages, they’re not foolproof.

When thermoplastics fail, it’s rarely the material’s fault. It’s usually a result of poor design choices, shallow understanding of the application, or shortcuts taken early in the project.
In this post, we’re calling out the top design mistakes that too many engineers sweep under the rug, especially in high-stakes sectors like semiconductors and PV solar manufacturing.
1. Assuming All Thermoplastics Are the Same
Just because it’s "plastic" doesn’t mean it’ll survive that acid line.
Mistake: Choosing PP where PVDF or ECTFE was needed.
Result: Rapid degradation, leaks, or stress cracking.
Better Approach: Always assess chemical compatibility, operating temp, and pressure, not just cost.
⚠️We’ve seen a 6-month-old line eaten from the inside because someone reused a material spec from a water line for an HF acid drain.
2. Neglecting Thermal Expansion in Long Runs
Thermoplastics expand 4–10x more than metals. Yet, many layouts ignore expansion loops or flexible joints.
Mistake: Rigid anchor supports with no expansion planning.
Result: Warping, cracking at joints, and increased stress on welds.
Better Approach: Use expansion loops, offsets, or flexible couplings and size them smartly.
⚠️ DI water can move your pipes more than you think, especially in overhead racks where you can’t easily inspect them due to UV action.
3. Improper Support Spacing
Support spacing isn’t a copy-paste from metallic lines. Thermoplastics sag , especially under fluid load.
Mistake: Applying metallic pipe span rules to plastic systems.
Result: Bellies in horizontal runs, flow issues, strain on joints.
Better Approach: Use material-specific support spacing charts — and consider full saddle supports for larger diameters.
⚠️ We once corrected a system where a 110 mm PVDF pipe sagged by 40 mm between poorly spaced supports — unnoticed for months in a ceiling void.
4. Poor Weld Geometry & Lack of Standardization
A thermoplastic system is only as strong as its weakest weld. Inconsistent weld profiles and poor prep are silent killers.
Mistake: Inconsistent bead geometry or incorrect heat soak time.
Result: Micro-cracks, premature joint failure, rework during commissioning.
Better Approach: Adhere strictly to DVS standards, and make sure welders are certified for that material and technique.
⚠️ Fancy CNC machines don’t fix operator ignorance. Training and supervision still matter.
5. Overlooking Joint Inspection & Testing
Unlike metallic welds, plastic welds are often hidden behind insulation or in hard-to-reach spaces. That’s no excuse for skipping QA.
Mistake: No visual inspection, X-ray, or pressure test of joints.
Result: Hidden leaks that appear weeks or months after commissioning.
Better Approach: Use tools like weld bead inspection gauges, hydro testing, and proper documentation of weld logs.
⚠️ An undocumented weld is a liability. Especially in a fab where downtime = millions.
Thermoplastic systems are brilliant when engineered and executed right. But shortcuts, assumptions, and outdated design thinking will cause even the best material to fail.
At P³ Systems, we believe great design prevents failure before the first pipe is even cut. That’s why we combine process knowledge, material science, and practical field insight to engineer systems that last.
Call to Action (CTA):
Looking for experts who’ve seen what works — and what doesn’t — in real-world fabs? Let’s talk. Our design team specialises in high-purity thermoplastic systems for the semiconductor and solar industries.