top of page

Project & construction management

End-to-end project execution support—from scheduling and resource planning to on-site coordination—for timely, efficient, and quality-driven delivery.

At P³ Systems, our Project Planning & Construction Management services go beyond timelines and charts—we drive precision, safety, and performance in every phase of your thermoplastic piping system installation. With deep roots in field engineering and a strong command of process-critical industries, we ensure that your project transitions smoothly from concept to commissioning.


Our team doesn’t just plan—we engineer the execution.


We specialize in managing projects where high purity, chemical compatibility, and compliance are non-negotiable. This includes:

  • Semiconductor fabs (front-end & back-end)

  • Solar cell manufacturing plants

  • Microelectronics & green hydrogen projects

  • High-purity water systems,

  • Chemical effluent drain network

  • Process exhaust ducting


Key Capabilities:
  • Construction strategy planning tailored for cleanroom and hazardous environments

  • Site readiness assessment and vendor coordination

  • Fabrication and assembly sequencing for thermoplastic systems

  • On-site engineering support and change management

  • On-site quality ensuring visits periodically by engineers to guide the construction team


Documentation & Compliance (Our Strength):

For high-purity and critical chemical applications, our deliverables include:

  • Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) documents

  • Weld Logs, Joint Traceability, and Material Test Certificates (MTCs)

  • Construction Work Packages (CWPs) with step-wise method statements

  • Cleanroom-compatible Standard Operating Procedures (SOPs) and maintenance guides

  • Safety & QA/QC documentation aligned with SEMI, FM, DVS, and ISO standards


Tools We Use:

Inhouse project software for planning & scheduling

AutoCAD Plant 3D & Navisworks for construction visualization

Excel & customized templates for weld tracking, RFI/RFC logs, and punch lists

Inspection & test plan (ITP) systems for QA


Our process ensures quality without compromise—with a team that has worked on the ground and understands the realities of piping system installations in complex, fast-paced environments. Whether it’s a greenfield fab or a brownfield retrofit, we bring clarity, coordination, and clean execution to your construction phase.



bottom of page